Facilities

55,000 square feet, all of it working.

One modern building on Highway 401 houses offices, design rooms, a tool shop and R&D facility, a production division and an integrated materials handling area with three loading bays. Here is the walk-through.

Sheet 05 / 12
Cobourg + Querétaro

The building

Everything a part needs, under one roof.

Designed on CAD stations, cut in the CNC machining centres, transferred to production or prototype presses and completed — Protoplast has all the equipment needed to finish your assignment without a subcontractor.

Floor area
55,000 sq ft
Inside
Offices · design rooms · tool shop · R&D facility · production division · integrated materials handling
Loading bays
Three
Highway
On Highway 401 — one hour east of Toronto, five hours west of Montreal
Air freight
Ninety minutes from Toronto's international airport
Export
Within about two hours of the U.S. border; ships internationally

The plant, photographed

Their floor, their photographs.

Seven frames from inside 210 Willmott Street — nothing staged, nothing from a stock library.

Scroll to cross the plant

Milling machines lined up in the Protoplast tool shop

01 · Tool shop

Where molds are cut

Mills, grinders and EDM benches build and maintain the molds that run a few doors down.

Tool shop — mold building and maintenance

Haas VF-3 and VF-4 CNC machining centres at Protoplast

02 · CNC

Programmed by day, run at night

Haas VF-3 and VF-4 machining centres with programmable tool changers run lights-out to use every production hour.

Haas VF-3 / VF-4 machining centres

Arburg injection molding press on the production floor

03 · Molding floor

38 to 600 tonnes

16 machines cover the range — straight injection, over-molding, two-component and injection blow molding.

Arburg press — production division

Operator working at a blue injection molding press

04 · At the press

Finishing on cycle

Operator stations beside the presses do light assembly and finishing while the next shot runs.

Press-side operator station

Molded black components staged in an assembly cell

05 · Parts

Molded, staged, moving

Components flow from press to cell to box inside one materials handling loop.

Assembly cell — molded components

Technician at a workstation on the Protoplast floor

06 · Bench

Hands where they matter

Manual stations handle the work robots shouldn't — inspection, odd fixtures, short runs.

Workstation — production floor

Coordinate measuring machine in the Protoplast metrology room

07 · Metrology

Proof, in microns

The CMM room verifies critical dimensions before a first article ever leaves the building.

CMM — metrology room

Visit

Walk it for real.

The plant is ninety minutes from Toronto's airport. A tour takes less time than a bad supplier audit.

Arrange a visit
SUR Manufactura banner at the Protoplast plant in Querétaro, Mexico
SUR Manufacturing — Querétaro, Mexico

Second plant

Querétaro, since October 2019.

SUR Manufacturing is Protoplast's 12,000 sq ft plant in Querétaro, Mexico, running four new injection molding presses from 80 to 500 tonnes. It has supplied the automotive industry since October 2019 and gives North American customers a second source inside Mexico's assembly corridor.

See it in person

Fifty-five thousand square feet of proof.

Book a plant tour or start with a design review — both begin with the same phone call.

(905) 372-6451 info@protoplast.com 210 Willmott Street, Unit #2, Cobourg, ON K9A 4K8